Pig Casting Machine

Pig casting machine (PCM) is used for molten iron continuous casting into slab in blast furnace iron making or non blast furnace Eight advantages of Shilin's Pig Casting Machine1.The motor adopts three-phase alternating current variable frequency speed controler, so the chain belt speed...
Blast furnace cooler stave

Blast furnace cooler stave

Blast furnace stave cooler is widely used in iron and steel industry. We will provide high quality and offer competitive price. Characteristics of Products:1. No tie-in inside body of cooling pipe, and screw head of pipe end shape up directly;2. Adopting special syphon mold, low ovality...
Tuyere unit

Tuyere unit

The tuyere units is the gorge that the hot blast stove blows hot air to the BF. I. Tuyere units for more than 1000M3 medium and large size Blast Furnace:Tuyere units of 1000M3 and higher medium and large size Blast Furnace transfer the hot air to Blast Furnace through the hot blast...
Coal injection Plant Project

Coal injection Plant Project

Range of design : 120m3~1000m3 BF  Due to the shortage of coking coal the price of metallurgical coke is becoming expensive, and this tendency forces iron making companies to find substitutes to reduce the cost. Consumption of coke can be partially substituted by coal injection...
Small and Middle Blast Furnace Project

Small and Middle Blast Furnace Project

Shilin can undertake total engineering, designing, equipment supply, construction and commissioning etc on the basis of turnkey The features of BF such as high production capacity, good quality of hot metal, less consumption of raw material and longer service life mainly depends on the...
Hot Blast Stove Project

Hot Blast Stove Project

Range of design : 120m3~1000m3 BF  Range of design : 120m3~1000m3 The features of BF such as high production capacity, good quality of hot metal, less consumption of raw material and longer service life mainly depends on the design, operating process and equipments of the BF. With...
Sinter plant project

Sinter plant project

Range of design : 6m2~160m2 Due to the shortage of metallurgical coke sinter is becoming one of the main charging material of BF;The production of sinter is one of the essential conditions to ensure the normal operation of BF, it can optimize the charging material, save energy and...